|
|
|
|
| LEADER |
00000nam a2200000 a 4500 |
| 001 |
15004 |
| 003 |
MY-KLNDU |
| 005 |
20241218060221.0 |
| 008 |
s1993 xxka i 001 0 eng d |
| 020 |
0 |
|
|a 0582411831 (v.2)
|
| 035 |
|
|
|a 0000007050
|
| 039 |
|
9 |
|a 201308251154
|b zul
|c 201303041636
|d shahrim
|y 200910081627
|z VLOAD
|
| 040 |
|
|
|a UPNM
|
| 090 |
|
|
|a TS 183
|b .T55 1993
|
| 100 |
1 |
|
|a Timings, R. L.
|q (Roger Leslie)
|
| 245 |
1 |
0 |
|a Manufacturing technology
|n volume 2
|c R.L. Timings.
|
| 260 |
|
|
|a Essex
|b Longman
|c 1993
|
| 300 |
|
|
|a viii, 383 p.
|b ill.
|c 22 cm.
|
| 500 |
|
|
|a Includes indexes.
|
| 650 |
|
0 |
|a Manufacturing processes.
|
| 650 |
|
0 |
|a Production engineering.
|
| 650 |
|
0 |
|a Technological innovations.
|
| 999 |
|
|
|a vtls000014673
|c 15004
|d 15004
|