Specification for the construction of slurry trench cut-off walls as barries to pollution migration

Saved in:
Bibliographic Details
Format: Book
Published: London Thomas Telford 1999
Subjects:
Tags: Add Tag
No Tags, Be the first to tag this record!

MARC

LEADER 00000pam a2200000 4500
001 33953
003 MY-KLNDU
005 20241218090312.0
020 0 0 |a 0727726250 
035 |a 0000026572 
039 9 |y 200910091544  |z VLOAD 
090 0 0 |a TD 195  |b S64 1999 
245 1 0 |a Specification for the construction of slurry trench cut-off walls  |b as barries to pollution migration 
260 0 0 |a London  |b Thomas Telford  |c 1999 
300 |a v.p.  |b ill.  |c 25cm 
650 0 0 |a Slurry trench construction 
650 0 0 |a Hazardous substances  |x Environmental aspects 
650 0 0 |a Concrete walls  |x Construction and design 
999 |a vtls000023420  |c 33953  |d 33953