Managing reality managing change book four
Managing Reality Book 4 Managing Change is for those who are managing change under the contract; whether for the employer or the contractor (or subcontractor) the management of change is often a major challenge whatever the form of contract. The ECC deals with change in a different way to traditiona...
Saved in:
| Main Author: | |
|---|---|
| Other Authors: | |
| Format: | Book |
| Language: | English |
| Published: |
London, UK
Institution of Civil Engineers (ICE)
2005
|
| Edition: | 2nd ed. |
| Subjects: | |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Table of Contents:
- Book 1. Introduction to the engineering and construction contract
- Book 2. Procuring an engineering and construction contract
- Book 3. Managing the contract
- Book 4. Managing change
- Book 5. Managing procedures
- Compensation Events
- Compensation Event Procedure
- Full and Shorter Schedule of Cost Components
- Example Quotations for Compensation Events
- Example People Cost Calculations
- Comparison between traditional preliminaries build-up and how they relate to SCC and SSCC
- Interrelationship between Contractor's and Subcontractor's share on target cost contracts
- Compensation events
- 1.1 Introduction
- 1.2 Compensation event procedure: background
- 1.3 What is a compensation event?
- 1.4 Where to find a list of compensation events
- 1.4.1 Core compensation events
- 1.4.2 Main Options B and D only
- 1.4.3 Secondary Options X14, Y(UK)2 and X15
- 1.4.4 Contract Data (part one)
- 1.5 Roles of the Project Manager and Contractor
- 1.6 Administering compensation events
- 1.6.1 Changes to the Completion Date
- 1.6.2 Changes to the Prices
- 1.6.3 Procedure for change
- 1.6.4 Cost of preparing for quotations
- 1.7 Notification of a compensation event
- 1.7.1 Proposed instruction or changed decision
- 1.7.2 Notification by the Project Manager
- 1.7.3 Notification by the Contractor
- 1.7.4 The four-point test
- 1.8 Quotations for compensation event
- 1.8.1 Introduction
- 1.8.2 When are quotations submitted?
- 1.8.3 Instructions for quotations
- 1.8.4 What is included in the quotation?
- 1.8.5 Acceptance of a quotation
- 1.9 Assessment of quotations
- 1.9.1 Assessment by the Project Manager
- 1.10 The use of the programme for the assessment of compensation events
- 1.10.1 Programmes which accompany compensation events
- 1.11 Implementation of compensation events
- 1.12 Reduction of Prices
- 1.13 Frequently asked questions
- 1.13.1 Eight-week barrier
- 1.13.2 Claims
- 1.13.3 Project Manager does not notify
- 1.13.4 Early warnings
- 1.13.5 Grouping compensation events
- 1.13.6 Amending the contract prior to execution
- 1.13.7 Removing compensation events
- 1.13.8 Adding compensation events
- 1.13.9 The Project Manager fails to act
- 1.14 Format of a compensation event quotation
- Appendix 1 Compensation event procedure
- Schedule of Cost Components
- 2.1 Introduction
- 2.2 What is the Schedule of Cost Components?
- 2.3 Why has this approach been taken?
- 2.4 Assessment options
- 2.5 When is the Schedule of Cost Components used?
- 2.5.1 Priced-based contracts - Options A and B contracts
- 2.5.2 Cost-based contracts - Options C, D and E contracts
- 2.5.3 Option F contracts
- 2.5.4 SCC summary
- 2.6 Defined Cost
- 2.7 The Fee
- 2.7.1 The Fee
- 2.8 The components of cost included under the full Schedule of Cost Components
- 2.8.1 Working Areas
- 2.8.2 Cost component heading 1: People
- 2.8.3 Cost component heading 2: Equipment
- 2.8.4 Cost component heading 3: Plant and Materials
- 2.8.5 Cost component heading 4: Charges
- 2.8.6 Cost component heading 5: Manufacture and fabrication outside the Working Areas
- 2.8.7 Cost component heading 6: Design outside the Working Areas
- 2.8.8 Cost component heading 7: Insurance
- 2.8A The components of cost included under the shorter Schedule of Cost Components (SSCC)
- 2.9 Contract Data part two
- 2.10 Putting it all together for payment - Option C
- 2.11 Audits
- 2.11.1 Compensation events
- 2.11.2 Options C, D and E
- 2.12 Use of the Shorter Schedule of Cost Components
- 2.12.1 People
- 2.12.2 Equipment
- 2.13 Practical issues
- 2.13.1 Working on multiple projects on the same site
- 2.13.2 Example of the principles of the assessment of change
- 2.13.3 Omissions
- 2.13.4 Project Manager's assessment
- 2.13.5 Numerous small compensation events
- 2.13.6 Issue of Site Information drawings
- 2.13.7 Occasions when Defined Cost is not used
- 2.14 Preliminaries and people costs
- 2.14.1 Introduction


